Source-linked briefing Business

Philippines DOE Moves to Fast-Track Up to 5,000 MW of New Coal

Philippines DOE Moves to Fast-Track Up to 5,000 MW of New Coal

The Energy Department plans to accelerate as much as 5,000 megawatts of coal-fired capacity to prevent blackouts. The push comes alongside the country’s ongoing rollout of renewable energy.

Original headline

DOE plans to restart coal capacity buildup

Be the source

Share your story

A link, a project or a professional achievement can be the start of a Spotlight story.

Sign in with QAuth